facebook
twitter
rss
account
search
search
 

Cleanup work resumes at damaged nuke plant

Dec. 21, 2012 at 3:30 PM   |   Comments

TOKYO, Dec. 21 (UPI) -- Operators of the damaged Fukushima nuclear power plant in Japan say they've restarted debris removal from the facility's Number 3 reactor building.

Workers with the Tokyo Electric Power Co. resumed debris clearance after a 23-foot-long, 1,000-pound steel frame was recovered from a spent fuel pool, Asahi Shimbun reported Friday.

The steel frame had been accidentally dropped into the fuel pool Sept. 22 during an attempt at debris removal. A remote-controlled crane had begun lifting the frame but it came loose and fell into the pool, Tepco said.

Officials said they didn't believe the steel frame damaged the fuel in the pool at the facility damaged in the March 2011 earthquake and tsunami.

Debris removal is expected to be completed by March, Tepco said.

© 2012 United Press International, Inc. All Rights Reserved. Any reproduction, republication, redistribution and/or modification of any UPI content is expressly prohibited without UPI's prior written consent.
Most Popular
1
Massive sunspot sending violent flares toward Earth Massive sunspot sending violent flares toward Earth
2
Google exec breaks skydive record with dive from near-space Google exec breaks skydive record with dive from near-space
3
Powerful new microscope sees cell division in real time Powerful new microscope sees cell division in real time
4
Coal-rich Poland wants concessions in EU climate deal Coal-rich Poland wants concessions in EU climate deal
5
Stone tools reveal Ice Age settlement in the Andes Stone tools reveal Ice Age settlement in the Andes
Trending News
Around the Web
x
Feedback