facebook
twitter
rss
account
search
search
 

U.S. reviews 44-year-old hydropower dam

June 17, 2013 at 8:18 AM   |   Comments

WASHINGTON, June 17 (UPI) -- U.S. federal regulators said they recommended more control measures for the expansion of a 44-year-old hydroelectric project in a Texas national forest.

The U.S. Federal Energy Regulatory Commission published its draft environmental impact statement on the expansion of the existing Toledo Bend hydroelectric project.

The facility is in the Sabine National Forest in Texas. FERC said it would affect land and waters in Texas and parts of Louisiana.

State authorities filed a request to install turbines to increase the electricity generated from the project.

FERC said its draft assessment called for more monitoring downstream from the facility. It said Louisiana and Texas authorities should be responsible for ensuring invasive species are kept out of the area. Additional measures should ensure protective species like the bald eagle are preserved and the river remains accessible for recreational use.

Comments on the draft survey are accepted until Aug. 5.

The facility started generating electricity in the late 1960s.

© 2013 United Press International, Inc. All Rights Reserved. Any reproduction, republication, redistribution and/or modification of any UPI content is expressly prohibited without UPI's prior written consent.
Recommended UPI Stories
Most Popular
1
Market Basket workers hail victory with announced sale to Arthur T.
2
Iran vetting oil customers
3
New gear to be supplied to deploying Australian troops
4
Brazil assessing capabilities of Russian air defense system
5
U.S. Navy receives first low-rate production RAM Bock 2 missile
Trending News
Video
x
Feedback