Advertisement

Topic: Mike Leinbach

Jump to
Latest Headlines Quotes

Mike Leinbach News




Wiki

Michael D. Leinbach is the Shuttle Launch Director at NASA's John F. Kennedy Space Center (KSC), Florida. He is responsible for activities in the overall shuttle launch countdown, including planning, policy, and execution.

Leinbach was born in Reading, Pennsylvania, and graduated from Yorktown High School, Arlington, Virginia in 1971. He received a Bachelor of Science in Architecture in 1976, and a Master of Engineering in Civil Engineering (emphasis in structural dynamics) in 1981 from the University of Virginia.

In 1984, Leinbach joined NASA as a structural engineer. Initially, Leinbach was a lead design engineer for various launch pad systems, including weather protection and the Emergency Egress Slide Wire system. In 1998, Leinbach became a NASA Test Director (NTD), responsible for directing daily operations at Kennedy Space Center (KSC) Launch Complex. In 1991, he was named Shuttle Test Director, and conducted the terminal countdown and launch of seventeen shuttle missions, in addition to being responsible for all planning activities associated with pre-launch.

This article is licensed under the GNU Free Documentation License.
It uses material from the Wikipedia article "Mike Leinbach."