NTSB looking at I-35W bridge de-icing

Published: Aug. 22, 2007 at 4:01 PM

MINNEAPOLIS, Aug. 22 (UPI) -- The make-up of the de-icing system installed on the collapsed Interstate 35W bridge in Minneapolis is being examined, federal investigators said.

In addition, the National Transportation Safety Board still is coordinating the removal of components it wants to study to determine the cause of the Aug. 1 bridge collapse, the safety board said Wednesday. The NTSB said investigators will remain in Minnesota until November.

The NTSB is examining the de-icing system installed on the bridge in 1997, the chemical used in

the system and what type of corrosive properties it might have, NTSB said in its update.

The federal agency said investigators received records from the bridge designer and will assess the design calculations. In addition, a list is being drawn of projects and modifications performed on the bridge since its construction 40 years ago.

Thirteen people died after the bridge collapsed into the Mississippi River.

© 2007 United Press International, Inc. All Rights Reserved.
Order reprints



Additional News Stories
Study produces new dyslexia findings (5 min)
ESA spacecraft performing well in orbit (21 min)
Wet ethanol process yields more ethanol (23 min)
Legal delays can't wash away shampoo hopes (25 min)
Safin's career ends with loss in Paris (40 min)
Sinclair Oil to bow out of retail (40 min)
Crude oil climbs toward $80 per barrel (44 min)
fark
Kyrgyzstan rejects UN ban on death penalty, offer of vowels
You know the price of college textbooks is getting out of hand when one gang of thieves can steal...
AMA calls for more marijuana research, Doritos
Problem: kids selling candy didn't raise much money for their middle school last year. Solution:...
How about a bra that doubles as a putting green with a built in speaker, pockets for extra balls...
San Franciscio Fark / Mentally Incontinent joint book signing and Fark Party, Thursday Nov 12 7pm...