facebook
twitter
rss
account
search
search
 

Cleanup work resumes at damaged nuke plant

Dec. 21, 2012 at 3:30 PM   |   Comments

TOKYO, Dec. 21 (UPI) -- Operators of the damaged Fukushima nuclear power plant in Japan say they've restarted debris removal from the facility's Number 3 reactor building.

Workers with the Tokyo Electric Power Co. resumed debris clearance after a 23-foot-long, 1,000-pound steel frame was recovered from a spent fuel pool, Asahi Shimbun reported Friday.

The steel frame had been accidentally dropped into the fuel pool Sept. 22 during an attempt at debris removal. A remote-controlled crane had begun lifting the frame but it came loose and fell into the pool, Tepco said.

Officials said they didn't believe the steel frame damaged the fuel in the pool at the facility damaged in the March 2011 earthquake and tsunami.

Debris removal is expected to be completed by March, Tepco said.

© 2012 United Press International, Inc. All Rights Reserved. Any reproduction, republication, redistribution and/or modification of any UPI content is expressly prohibited without UPI's prior written consent.
Most Popular
1
Android phones to join iPhone in saying no to the police Android phones to join iPhone in saying no to the police
2
Physicists teleport photon over 15 miles Physicists teleport photon over 15 miles
3
Major palm oil companies to halt deforestation Major palm oil companies to halt deforestation
4
Perth's first iPhone buyer immediately drops brand new phone on live TV Perth's first iPhone buyer immediately drops brand new phone on live TV
5
Dogs are the favorite food of leopards in rural India Dogs are the favorite food of leopards in rural India
Trending News
Video
x
Feedback