'Ride Along' leads weekend at U.S. box office

Feb. 2, 2014 at 7:50 PM
share with facebook
share with twitter
| License Photo

LOS ANGELES, Feb. 2 (UPI) -- The comedy "Ride Along," starring Kevin Hart and Ice Cube, led the U.S. box office for the third weekend with a modest $12.31 million in receipts.

The long-running animated film "Frozen" was second with $9.31 million.

All studio estimates of gross North American receipts are via Box Office Mojo.

"That Awkward Moment" was a close third with $9.01 million; "The Nut Job," another animated film, was fourth with $7.61 million; "Lone Survivor" came in fifth with $7.16 million; "Jack Ryan: Shadow Recruit" was sixth at $5.4 million; "Labor Day" seventh with $5.3 million; "American Hustle" eighth with $4.3 million; "The Wolf of Wall Street" ninth with $3.55 million.

"I, Frankenstein" was a close 10th with $3.52 million.

Related UPI Stories
Trending Stories