UPI en Español  |   UPI Asia  |   About UPI  |   My Account
Search:
Go

Oil rig explosion

|
 
Crews work on May 8, 2010, collect oil near and around the location where the Deepwater Horizon oil platform caught fire and sank in the Gulf of Mexico. At least 193 vessels are assisting in the oil spill recovery after the platform sank April 20, 2010. UP/ICasey J. Ranel/USCG
Crews work on May 8, 2010, collect oil near and around the location where the Deepwater Horizon oil platform caught fire and sank in the Gulf of Mexico. At least 193 vessels are assisting in the oil spill recovery after the platform sank April 20, 2010. UP/ICasey J. Ranel/USCG 
License photo
Published: May 13, 2010 at 8:45 AM
By United Press International

NEW ORLEANS, May 13 (UPI) -- The Gulf of Mexico drilling rig explosion that started a massive oil leak came about through a "calamitous series" of failures, a U.S. congressman said.

Officials from several companies with links to the Deepwater Horizon oil platform appeared before congressional committees this week. The platform exploded in flames April 20, killing 11 workers. Since then about 5,000 barrels of oil have been spewing the gulf daily.

U.S. Rep. Henry Waxman, D-Calif., and chairman of the House Energy and Commerce Committee, said some 100,000 pages of documents were submitted by companies, including rig operator BP, platform owner Transocean and contractor Halliburton, and indicate how the tragedy started.

"This catastrophe appears to have been caused by a calamitous series of equipment and operational failures," Waxman said.

Another committee member, Rep. Bart Stupak, D-Mich., said the blow-out preventer, meant to keep such a disaster from occurring, had a leak in a hydraulic system and a dead battery in a device designed as backup to shut down the oil flow, as well as other issues.

BP, in a release Thursday regarding efforts in the gulf to close off the spewing wellhead, said it was still working to get the blow-out preventer to operate. One possible solution involved injecting "material of varying densities and sizes" into the blow-out preventer to seal the wellhead and pumping other fluids into the well to further halt the oil flow.

Topics: Gulf Oil Spill, U.S. Rep. Henry Waxman
Recommended Stories
© 2010 United Press International, Inc. All Rights Reserved. Any reproduction, republication, redistribution and/or modification of any UPI content is expressly prohibited without UPI's prior written consent.

Order reprints
Join the conversation
Most Popular Collections
'Star Trek Into Darkness' screening NBC upfronts Met Ball 2013
'Great Gatsby' premieres in New York Spire raised on top of One WTC 2013: Celebrity break ups and divorces
1 of 14
Obama in Berlin
View Caption
A child is seen playing at the Memorial to the Murdered Jews of Europe on the eve of U.S. President Barack Obama's visit to Berlin on June 18, 2013. Obama is scheduled to meet German Chancellor Angela Merkel and will later speak at the Brandenburg Gate where fifty years earlier, U.S. President John F. Kennedy delivered his famous "Ich bin ein Berliner (I am a Berliner)" address . UPI/David Silpa
fark
UFOlogist Scott Waring loves bashing NASA for withholding the truth about alien life, and in his...
You're definitely doing it wrong if you spray paint anti-gay slurs on walls of a Chik-fil-A
Police say a 911 call reporting a hostage situation and shooting that resulted in SWAT team mobilization...
British report recommends bankers go directly to jail, do not pass Go, do not collect $200 (million)...
"My wife found out I knocked up an alien cat woman and was very unhappy. That caused a few problems,...
Oh, no, not this shiat again