F135 engine sets record during test

Published: Nov. 9, 2009 at 3:11 PM

ARNOLD AIR FORCE BASE, Tenn., Nov. 9 (UPI) -- A U.S. Air Force team testing the F135-PW-100 engine has reached a milestone ahead of qualifying the engine for the F-35 Lightning II joint strike fighter.

The evaluation team at the Arnold Engineering Development Center in Tennessee announced it successfully ran the F135-PW-100 engine continuously for more than 52 hours. Officials say the duration of the test set a record for the longest continuous engine test period, the Air Force reported.

The F135-PW-100 engine tests are a critical step for the technology ahead of qualification for the Air Force's new F-35 Lightning II joint strike fighter.

"This test was not just on a specific engine, per se, or just the F135 program, but this qualification test affects the whole Joint Strike Fighter program," John Kelly, Air Force manager for the project, said in a statement.

© 2009 United Press International, Inc. All Rights Reserved.
Any reproduction, republication, redistribution and/or modification of any UPI content is expressly prohibited without UPI's prior written consent.

Order reprints



NBA: Chicago 109, Indiana 101 (3 min)
NHL: Carolina 4, Florida 1 (7 min)
UPI NewsTrack TopNews (26 min)
NBA: Philadelphia 119, Minnesota 97 (31 min)
COL BKB: Georgetown 79, Providence 70 (40 min)
NBA: Charlotte 94, Washington 92 (42 min)
COL BKB: Vanderbilt 90, Tennessee 71 (44 min)
fark
You know how you have to break in to a store because all of the doors are locked? The same rules...
Armed robbery suspect who continually threatened to kill employees described as 'nicely dressed'...
This First Amendment thing - it does not mean what you think it means
Photoshop this dapper gentleman on a loopy couch
Teacher hits student with clipboard. Student allegedly sustained bodily injury, shock, and injury...
Study shows older women have higher risk of having autistic children.... because the vaccines multiply...