facebook
twitter
rss
account
search
search
 

Enbridge pumped oil through ruptured line

May 31, 2012 at 8:17 AM   |   Comments

WASHINGTON, May 31 (UPI) -- Pipeline operators in Canada restarted a ruptured pipeline in Michigan twice in 2010 before they realized there was an accident, records indicate.

The National Transportation Safety Board found Line 6B of the Lakehead pipeline system in Marshall, Mich., ruptured July 25, 2010. Authorities at pipeline operator Enbridge, however, didn't recognize the pipeline had ruptured until 17 hours later.

A report from Inside Climate News, backed up by NTSB records, found Enbridge operators in Canada believed they were receiving false alarms from the pipeline's system. Line 6B was undergoing a shut down in Indiana before the spill and operators believed pressure drops represented air pockets in the line, not a rupture, the reports found.

After the rupture, operators pumped oil under high pressure for one hour and later for 45 minutes before the break was confirmed.

The NTSB said the rupture on the pipeline measured about 6 feet by 4.5 inches at its widest location.

Enbridge early this month issued a proposal to the Michigan Public Service Commission to replace more than 200 miles of Line 6B, part of the oil pipeline system transporting so-called tar sands oil from Canada.

© 2012 United Press International, Inc. All Rights Reserved. Any reproduction, republication, redistribution and/or modification of any UPI content is expressly prohibited without UPI's prior written consent.
Most Popular
1
Russian currency crashes Russian currency crashes
2
Navy tests MQ-8C unmanned helos Navy tests MQ-8C unmanned helos
3
New submarine set for commissioning New submarine set for commissioning
4
SM-6 long-range interceptors on target in U.S. Navy test SM-6 long-range interceptors on target in U.S. Navy test
5
Sweden plans to replace its Defense and Security Export Agency Sweden plans to replace its Defense and Security Export Agency
Trending News
Around the Web
x
Feedback