facebook
twitter
rss
account
search
search
 

Nord Stream reopens after integration

April 30, 2012 at 9:40 AM   |   Comments

ZUG, Switzerland, April 30 (UPI) -- The Nord Stream pipeline was reopened following a procedure meant to integrate the twin natural gas system, the consortium said.

The Nord Stream project consortium said mid-April that it was closing the pipeline for two weeks to test and certify an integrated control system for the twin pipeline network.

The consortium said gas deliveries have resumed through the network.

"Nord Stream completed the process of adapting the control system to integrate the two lines into a single automated twin-pipeline gas transport system," it said in a statement.

Russia aims to diversify European transit options through Nord Stream, which runs from the shores of the Gulf of Finland through the Baltic Sea to Germany.

The consortium said it was entering "an intensive period" as it prepares the control system for the integration of the twin pipelines into a single network. Completion of the second line is expected by June.

Both lines, once fully operational, will transport around 1.9 trillion cubic feet of Russian gas each year to European consumers for at least 50 years.

© 2012 United Press International, Inc. All Rights Reserved. Any reproduction, republication, redistribution and/or modification of any UPI content is expressly prohibited without UPI's prior written consent.
Recommended UPI Stories
Featured UPI Collection
trending
Celebrity Couples of 2014 [PHOTOS]

Celebrity Couples of 2014 [PHOTOS]

Most Popular
1
Northrop Grumman developing reusable space plane for lifting spacecraft into orbit
2
Construction on Russian gas line to China slated for September
3
Corona Extra recalled due to glass particles in beer
4
Navy to test Lockheed Martin's FORTIS exoskeleton
5
Final builder sea trials for Australian landing helicopter dock ship
Trending News
Video
x
Feedback